What Causes Delays?

THE WEATHER
Safety of our employees and our subcontractors, is of the utmost importance. They are not permitted to install equipment up on the towers when it is raining, snowing and/or when wind conditions are 30 mph or more.

STRUCTURAL ANALYSIS
A structural analysis is a vital step in creating a strong network. This step requires 35 days to complete a thorough analysis. If the tower fails, our design engineers need to locate an alternative structure and repeat the process.

UTILITY CONTRACTORS
Power and fiber connection is an essential step in our construction process. If National Grid or DANC is behind schedule this slows us down as well. National Grid is 120 days behind schedule due to natural disaster recovery and the State grant award that are in the pipeline.

Facebook Comments

comments

3 Comments

  1. Customwritings

    I completely agree. Such a wonderful place with fabulous wine and great food. We had such a great time. Thank you again for all of your recommendations and I look forward to continuing my journey next week

    Reply
  2. Patricia Thomad

    Do you have any timeframe for the North Shore at Lake Bonaparte?

    Reply

Submit a Comment

Your email address will not be published. Required fields are marked *